Building permit applications must be submitted through the Citizenserve Portal.

  • Citizenserve Instructions
  • For Citizenserve technical issues or help navigating portal, please contact their Support Center at 1-800-325-9818; a member of their support team will be able to assist you. If you receive a voicemail, all staff are busy; please leave a message and your call will be returned promptly.

Building Permit & Application Information

FOR ALL PERMITS WHICH REQUIRE THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY: 

It is the responsibility of the applicant that the Building Department receive written approval from the following individuals, agencies, and/or departments prior to occupancy of structure.

  1. Final electrical inspection by an authorized inspection agency.
  2. Final inspection letter submitted to the Building Department prior to backfilling of "special" septic systems.
  3. Surveyed as-built plot plan submitted to the Building Department.
  4. Final inspection by the Fire Code Enforcement Officer of fireplaces, woodstoves, furnaces, water heaters, or other heat-producing equipment.
  5. Final inspection by the Building Department when building is completed.

The Building Department will issue a Certificate of Occupancy to an applicant when all the above items have been completed.

IT IS ILLEGAL TO OCCUPY ANY BUILDING WITHOUT A CERTIFICATE OF OCCUPANCY (IN VIOLATION OF THE CODE OF THE TOWN OF CLIFTON PARK ZONING REGULATIONS SECTION 208-108).

Under normal circumstances, your Certificate of Occupancy document will be prepared within forty-eight (48) hours after completion of all of the above. 

Please be advised that inspections must also be called for at the following intervals:

  1. Footings before pour.
  2. Foundation after waterproofing, but before backfill.
  3. Sewer/septic and water installation (before backfill).
  4. Rough frame including plumbing, wiring, and heating, but without insulation.
  5. Insulation before sheetrock.
  6. Fireplace inspections as required by Fire Code Enforcement Officer.
  7. Furnace, water heater, or other heat-producing equipment.
  8. Final inspection.

A TWENTY-FOUR HOUR NOTICE IS REQUIRED TO SCHEDULE ALL INSPECTIONS. 

Building Permit Fees


Created: October 3, 2025
Please be advised: Due to the dry conditions in our area a Burn Ban has been put into effect until further notice. For more information please see NYS DEC Fire Danger Map
Created: September 16, 2025
A building permit (and final inspection conducted by the Building Department) is required for the following equipment which is fuel-fired: Boiler Furnace Water Heater (gas-fired) Fireplace (wood or gas) Woodstove (wood or gas) The health a…
Created: May 1, 2025
A message from the Department of Building and Development   A building permit is required for swimming pools and hot tubs, and all required inspections (conducted by the Building Department) must be conducted and APPROVED prior to use per Ne…
Created: November 13, 2024
PLEASE BE ADVISED: There is a statewide Burn Ban in place for New York State. No Burn Permits will be issued until the ban has been lifted. The Burn Ban supersedes any Burn Permits that have been issued previously. While the statewide Burn Ban is i…
Created: October 25, 2024
We are entering cold weather season.  For the safety of our Town residents, please be sure that your contractor is securing a building permit for the installation of wood and gas-fired heat appliances (fireplaces, wood stoves, water heaters, etc.)…
Created: June 5, 2024
A building permit is required for swimming pools and hot tubs, and all required inspections (conducted by the Building Department) must be conducted and APPROVED prior to use per New York State Law. The health and safety of our Town residents is ou…
Created: March 20, 2024
In coordination with Saratoga County, the Cities of: Mechanicville, Saratoga Springs, Towns of: Ballston, Charlton, Clifton Park, Corinth, Day, Edinburg, Galway, Greenfield, Hadley, Halfmoon, Malta, Milton, Moreau, Northumberland, Providence, Sarato…
Created: July 1, 2023
Update 6/26/2023: The Country Knolls pool will open today at noon! Our team is completing the final opening details this morning. The last couple of weeks have been frustrating and another example of issues we have experienced with contractors this…
Created: January 18, 2017
The Town of Clifton Park’s Fire Cope Appeals Board consists of six members and a chairman who are appointed by the Town Board for a three year term. The Fire Code Appeals Board reviews any appeals to the Code of The Town Of Clifton Park and has the…

Wade Schoenborn

Director of Building & Development

Office Hours

Monday - Friday
8:00am - 5:00pm

Location

1 Town Hall Plaza
Clifton Park, NY 12065


Samuel C. Chase
Code Enforcement Officer

John DeSimone
Chief, Bureau of Fire Prevention

Ryan Boni
Building Inspector

James Coulombe
Building Inspector

Bruce Spiegel
Building Inspector

Tim Brousseau
Building Inspector

Cristi Shuhart
Principal Typist

Dolores Mabb
Principal Typist